Install Push-Op Connector On Apparatus Bushing - Eaton 600 A 15 kV class PUSH-OP Installation Instructions Manual

Deadbreak apparatus connectors
Hide thumbs Also See for 600 A 15 kV class PUSH-OP:
Table of Contents

Advertisement

Install PUSH-OP deadbreak connector on apparatus
bushing
Step 9
Install PUSH-OP deadbreak connector on apparatus
bushing
• Clean and lubricate mating interface of PUSH-OP
deadbreak connector and mating apparatus bushing.
• Grasp deadbreak connector operating eye with clampstick
and pull eye completely into clampstick.
• Move deadbreak connector to apparatus bushing,
engaging shroud locating pins in bail bracket locking slots
(refer to Figure 11), and push until latch plate engages
first notches. (Refer to Figure 12.)
CLAMPSTICK
Figure 11. Line illustration of full engagement of push
plate.
CLAMPSTICK
Figure 12. Line illustration of beginning engagement of
latch plate.
600 A 15/25 KV CLASS PUSH-OP DEADBREAK CONNECTOR INSTALLATION INSTRUCTIONS MN650057EN May 2017
BAIL BRACKET
LOCKING SLOTS
LOCATING
PIN
LATCH PLATE
FIRST NOTCH
• Release operating eye from clampstick.
• Push forward on push plate firmly with clampstick until a
bump is felt and latch plate fully engages locking teeth.
(Refer to Figure 13a.)
CLAMPSTICK
Figure 13a. Line illustration of full engagement of push
plate.
• Pull on push plate with clampstick to ensure latch plate is
engaged.(Refer to Figure 13b.)
Figure 13b. Check latch engagement.
LOCKING
PUSH PLATE
TEETH
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

600 a 25 kv class push-op

Table of Contents