Eaton Cooper Power Series Installation Instructions Manual

Deadbreak apparatus connectors, bushing adapter cap

Advertisement

Quick Links

Deadbreak Apparatus
Connectors
MN650050EN
600 A 15, 25, and 35 kV class PUSH-OP bushing adapter cap
installation instructions
Effective May 2017
Supersedes January 2010 (S600-19-1)
COOPER POWER
SERIES

Advertisement

Table of Contents
loading

Summary of Contents for Eaton Cooper Power Series

  • Page 1 COOPER POWER Deadbreak Apparatus Connectors SERIES Effective May 2017 MN650050EN Supersedes January 2010 (S600-19-1) 600 A 15, 25, and 35 kV class PUSH-OP bushing adapter cap installation instructions...
  • Page 2 CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES. In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability or other- wise for any special, indirect, incidental or consequential damage or loss whatsoever, including but not limited to damage or...
  • Page 3: Table Of Contents

    Contents SAFETY INFORMATION Safety Information ................iv PRODUCT INFORMATION Introduction .
  • Page 4: Safety Information

    FOR LIFE FOR LIFE Eaton meets or exceeds all applicable industry standards relating to product safety with its Cooper Power™ series products. We actively promote safe practices in the use and maintenance of our products through our service literature, instructional training programs, and the continuous efforts of all Eaton employees involved in product design, manufacture, marketing, and service.
  • Page 5: Product Information

    It has electrical characteristics identical to those the intended application before it is installed.) of the LRTP . Used with Eaton's Cooper Power series 200 A insulated protective cap, M.O.V.E. arrester, grounding The bushing adapter cap should be installed and...
  • Page 6: Acceptance And Initial Inspection

    • during installation, operation, or maintenance. For additional 200 A Loadbreak Protective Cap (Optional) • information, contact your Eaton representative. Equipment required Acceptance and Initial Inspection Tools: • Each PUSH-OP bushing adapter cap is in good condition when accepted by the carrier for shipment.
  • Page 7: Bushing Adapter Cap Removal Process

    Step 3. Assemble to apparatus bushing Grasp operating eye on bushing adapter with hotstick and • pull eye completely into hotstick. Place bushing adapter cap on PUSH-OP apparatus • bushing, engaging shroud pins in bail bracket locking slots, and push until latch plate engages first notches. Release operating eye from hotstick.
  • Page 8 United States Eaton.com/cooperpowerseries © 2017 Eaton All Rights Reserved Eaton is a registered trademark. Printed in USA For Eaton's Cooper Power series product Publication No. MN650050EN information call 1-877-277-4636 or visit: All trademarks are property www.eaton.com/cooperpowerseries. May 2017 of their respective owners.

This manual is also suitable for:

600 a 35 kv class push-op600 a 25 kv class push-op600 a 15 kv class push-op

Table of Contents