Installation Diagrams; Sealing; Coupling; Impurities - Danfoss APP series User Manual

Hide thumbs Also See for APP series:
Table of Contents

Advertisement

Installation
8.
Prior to installation, burrs and chips and
other impurities must be removed from
pipes and hoses, eg with a felt plug
9.
Fittings in screwed components to be
sealed with O-rings or bonded seals
10.
Correctly limited quantities of grease
prevent seizing

Impurities

Chips or other impurities in the system
may cause damage

Sealing

Using teflon tape or packing yarn in
joints may cause damage
Grease
Too much grease may develop
biofilm causing operational failures
Assembly of coupling
11.
The coupling must be easy and simple
to assemble (see product instruction)
12.
= min. 3 mm
Ensure always to have 3 mm distance
between coupling flanges
Water supply
13.
Fill system with water before starting
to ensure lubrication and cooling
Never use force when assembling the
coupling parts, as this will damage the
motor/pump

Coupling

0 mm
Insufficient distance and/or misalign-
ment between the coupling flanges
will damage the pump
Starting without water will cause
damage

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the APP series and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF