Download Print this page

Curtis CFB3 User Manual page 7

Three bowl frozen beverage machine
Hide thumbs Also See for CFB3:

Advertisement

INSTALLATION INSTRUCTIONS
Installation
Unpack the unit
1
When unpacking the unit, keep the original packaging
materials in the event the unit needs to be returned to
the manufacturer.
IMPORTANT: RMAs will not be accepted
unless the unit is packaged in the original
packaging material.
Leveling
2
Locate the legs, packaged inside the bowls. Thread
them into the mounts on the bottom of the unit. Hand
tighten into place.
WARNING: Use the leveling legs to level the
machine only. Do not use them to adjust the
height of the unit. Do not extend them higher
than necessary.
3
Position the machine on the counter top. Level it left
to right and front to back by turning the bottom of the
legs.
Attach Drip Trays and Handles
4
Locate the drip trays, packaged inside the bowls.
5
Position the drain hose in the opening in the top of
each tray. Then, insert the tabs on the back of the drip
tray into the holes on the front of the chassis. Push
down gently to secure in place.
6
Prepare to install the dispensing levers by removing
the handles from the taps. Push in on the top of the
handle with your thumb while pulling up on the bottom
Style varies
Drain hose
II42
2
3
5
6
052218NC

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Cfb3a30Cfb3a31