Carry out the following steps and procedures to put the unit into operation after installing it in a new
workspace environment.
1.
2.
3.
4.
5.
20 |
P a g e
O
PERATION
Attach the power cord that came with the unit to the power inlet
receptacle on the side of the incubator.
Plug the power cord into the workspace electrical supply outlet.
Place the incubator Power Switch in the on ( I ) position.
The Power light illuminates
•
The Temperature display illuminates
•
Set the Temperature the Set Point
temperature.
See page 21
•
Set the Over Temperature Limit.
The incubator must be heated and stable at your application temperature to
perform this procedure.
Allow the unit to run 8 hours (overnight) prior to:
Loading
Samples, page 23
•
Verifying the accuracy or calibrating the incubator temeprature
•
display.
End of procedure
to your incubation application
See page 22.