Put The Incubator Into Operation - Shel lab SMI2 Installation And Operation Manual

Smi incubator 100 – 120 voltage
Table of Contents

Advertisement

OPERATION
P
I
UT THE
NCUBATOR INTO
Carry out the following steps and procedures to put the unit into operation after installing it in a new
workspace environment.
1.
2.
3.
4.
5.
20 |
P a g e
O
PERATION
Attach the power cord that came with the unit to the power inlet
receptacle on the side of the incubator.
Plug the power cord into the workspace electrical supply outlet.
Place the incubator Power Switch in the on ( I ) position.
The Power light illuminates
The Temperature display illuminates
Set the Temperature the Set Point
temperature.
See page 21
Set the Over Temperature Limit.
The incubator must be heated and stable at your application temperature to
perform this procedure.
Allow the unit to run 8 hours (overnight) prior to:
Loading
Samples, page 23
Verifying the accuracy or calibrating the incubator temeprature
display.
End of procedure
to your incubation application
See page 22.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SMI2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Smi6Smi7Smi12Smi11

Table of Contents