The unit is heavy. Use appropriate lifting devices that are sufficiently rated for these loads. Follow these
guidelines when lifting the unit.
Lift the unit only from its bottom surface.
Doors, handles, and knobs are not adequate for lifting or stabilization.
Restrain the unit completely while lifting or transporting so it cannot tip.
Remove all moving parts, such as shelves and trays, and lock doors in the closed position
during transfers to prevent shifting and damage.
L
EVELING
Install the 4 leveling feet with the 4 corner holes on the bottom of the unit. The unit must be level and
stable for safe operation.
Note:
To prevent damage when moving the unit, turn all four leveling feet so that the leg of each
foot sits inside the unit.
I
I
NSTALL
NCUBATOR IN
Install the unit in a workspace location that meets the criteria discussed in the previous entries of the
Installation section.
I
C
NSTALLATION
LEANING
Cleaning and disinfecting the incubation chamber during installation reduces the chance of microbiological
contamination. The unit was cleaned and disinfected at the factory. However, the unit may have been
exposed to contaminants during shipping. Additionally, the factory procedure may not meet the standards
of your institutional protocols. Please see the
Maintenance section for information on how to clean and disinfect without damaging the chamber.
Remove all wrappings and coverings from shelving prior to cleaning and installation.
12 |
P a g e
L
OCATION
Cleaning and Disinfecting
entry on page 25 in the User

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SMI2 and is the answer not in the manual?

This manual is also suitable for:

Smi6Smi7Smi12Smi11

Table of Contents