Cabinet Installation - Alpha ESS PWG2-50K User Manual

100k-ex bi-directional hybrid storage inverter
Table of Contents

Advertisement

12 Chapter IV Device Installation

4.5 Cabinet installation

After the cabinet is removed to the installation position with a forklift or a tool. Fine adjust the cabinet and remove
it to the designed position, open the internal door of cabinet, use M13 screw to fix the cabinet, as shown in Fig.4-4.
When the cabinet needs to be fixed on the steel channel, Φ14 holes can be made in the steel channel. Fix the
cabinet to the steel channel with screws, as shown in Fig.4-5.
Fixed screw
Channel
steel
Fig. 4-5 Fix the cabinet to the steel channel
When the cabinet is fixed to the concrete floor, make holes on the floor and fix the cabinet to the concrete floor with
expansion screws, as shown in Fig.4-6.
Fig.4-4. Diagram for cabinet base
Cable
groove
Front side of cabinet
Ground
Foot screw
Fig.4-6 Fix the cabinet to the concrete floor
8-14X24 waist hole
cable
groove

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pwg2-100k

Table of Contents