Chapter Vi Operation Control Display Panel; Operation Instructions; Main Interface Of Monitoring Startup; Interface Of Main Wiring Diagram - Alpha ESS PWG2-50K User Manual

100k-ex bi-directional hybrid storage inverter
Table of Contents

Advertisement

22 Chapter VI Operation Control Display Panel

6.1 Operation instructions

This section introduces LCD display content and settable parameters. Relevant operation control can be conducted
via human-computer interface.
LCD display interface can provide 800×600 pixel graphic display, display warning information in real time, provide
historical warning records for user's query and offer a reliable basis for fault diagnosis. Through LCD display
interface, users can conduct various operation commands, conveniently browse input, output, operation
parameters and waveforms and timely obtain current storage inverter state and warning information. LCD can also
display the version information of system control software and internal monitoring software.
The PWG series are already designed compliant to some European national, and Australia/New Zealand grid-interaction codes.
Depending on the order, the PWG series product will be configured at factory for the region where the project will be deployed

6.1.1 Main interface of monitoring startup

After auxiliary power of storage inverter is connected, LCD is on. At this moment, a startup interface will appear, as
shown in Fig.6-1. It shows that the system is booting. After system booting, the interface will disappear.

6.1.2 Interface of main wiring diagram

After startup, enter the interface of main wiring diagram as shown in Fig. 6-2. Under the main wiring interface,
Chapter VI Operation Control Display Panel
The system is booting,please wait......
Fig.6-1 Welcome interface for startup
Attention

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pwg2-100k

Table of Contents