Open-Case Inspection; Overview; Packing List - Alpha ESS PWG2-50K User Manual

100k-ex bi-directional hybrid storage inverter
Table of Contents

Advertisement

Don't insert the module into the cabinet and move them together!
Before the cabinet is moved, pull out the module and move the cabinet alone. Don't insert the module into the cabinet
and move them together!

4.3 Open-case inspection

Overview

4.3.1
Before installation of Bi-directional Hybrid Storage Inverter, open-case inspection needs to be conducted. The
inspection includes the following:
Check whether the items in the packing are consistent with real items.
Check whether the data of product nameplate is consistent with the contract, including product model,
rated capacity and voltage grade.
Check whether the ex-factory documents and accessories are complete.
Check whether the module of Bi-directional Hybrid Storage Inverter is deformed.
Check whether the inverter cabinet is deformed, paint peeling or loose.

Packing list

4.3.2
Refer Table 4-1 for packing list of cabinet of storage inverter:
Fig.4-1 Moving method for Bi-directional Hybrid Storage Inverter
Table 4-1 Packing list of cabinet of storage inverter
Warning
Chapter IV Device Installation 9