Samsung 136S Installation Manual page 86

Lithium ion battery system for ups
Hide thumbs Also See for 136S:
Table of Contents

Advertisement

.
Assembling the Product
3
NOTICE
See the examples for correct signal cable wire connections for both left and right rack
alignments.
16. For a multiple rack system, connect the signal cables ―WIRE ASSY RACK TO RACK #2‖ between each
rack's Switchgear. Push the pre-punched hole to pass the cable through a circular hole in the side of the rack
frame and through the opening above Module #1 and Module #16.
17. Connect the signal cable from the left port of Switchgear #1 CAN to the right port of Switchgear #2 CAN.
18. Repeat for the remaining Switchgear Assemblies.
19. Slide the switch to the ―ON‖ position for the last Switchgear.
Signal Cabling Examples of Left Alignment of Trays
72
Figure 3-88: Pre-Punched Hole for Signal Cable
ET003222373
English 4/2018. Rev 0.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents