Connect a ground cable between the SMPS Assembly and the Rack Frame with an M5
x 10 mm screw. (Torque: 5.1–6.1 Nm [45–54 in lbs])
Verify that the torque setting is correct.
ET003222373
English 4/2018. Rev 0.0

Figure 3-15: Ground Cable Connection to the SMPS Assembly

.