Assembling the Product
3
2. Connect the DC link high-voltage cables from the UPS.
CAUTION
Verify with a voltmeter that no power is present on the system. Disconnect all input
power supplies. Use lock out/tag out procedures to secure the UPS and battery system
before beginning this step.
In this step, the battery and UPS are isolated by the Switchgear because the circuit
breaker in the switchgear is opened.
NOTICE
Connect the high-voltage cables using an M12
The fastening torque should be 30 Nm (265 in
After installation is complete, check the following:
 Bolt fastening condition