Mitsubishi Electric QJ71DN91 User Manual page 122

Melsec q series, devicenet master-slave module
Hide thumbs Also See for QJ71DN91:
Table of Contents

Advertisement

7 PROGRAMMING FOR EXECUTING THE MASTER FUNCTION
7 - 14
(e)
Confirm the parameters configured automatically.
Check the auto configuration result is displayed on [Parameter Setting]
screen of the intelligent function module monitor (QJ71DN91).
1)
Check the parameters for master function.
Check that the settings such as node No., connection type, and I/O
points are correct. (For the setting details, refer to Section 7.3 (1).)
2)
Correct values if any incorrect setting is identified.
Repeat this if more than one value must be corrected.
3)
To start I/O communication automatically at power-up, set "Start" to
[Auto Communication Start Setting].
POINT
(1) Slave node settings detected by auto configuration are stored in order of node
No.
(2) When changing parameters for master function, set default values in the areas
after the parameter-set areas.
(Example) When changing the number of slave nodes that can perform I/O
communication from 6 to 4, set default values in the areas for 5th and
6th slave nodes.
(f)
Save parameters to a flash ROM. (Refer to (3) in this section.)
MELSEC-Q
7 - 14

Advertisement

Table of Contents
loading

Table of Contents