Operational Tests - Kannad 406 AF-COMPACT Installation Manual

Emergency locator transmitter
Hide thumbs Also See for 406 AF-COMPACT:
Table of Contents

Advertisement

2. Operational tests

These tests must be performed by maintenance personnel when performing
the first power up procedure or to check RCP monitoring and control
B. RCP operational
transmission
test).
A. ELT operational tests
NOTE: ELT operational tests only provide the aircraft operator with an indica-
tion that the ELT is transmitting; however, a positive result cannot be interpret-
ed as meaning that the ELT meets all operational parameters.
• connect RCP to J1 and outside antenna to J2;
• switch the ELT from OFF to ARM;
• check that the Self-Test result is OK (one long flash).
B. RCP operational tests
Check
correct
annunciator and external buzzer by switching
ELT and RCP as described in the sequential
procedure
Figure 301: RCP LED operation
(with ELT switch in the "ARM" position).
INSTALLATION MANUAL OPERATION MANUAL INSPECTION LOG
tests) or transmitter
operation
of
KANNAD 406 AF-COMPACT
(Refer to C. 406 and 121.5 MHz
RCP
LED
Figure 301: RCP LED operation
(Refer to
PAGE: 302
FEB 01/2008

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents