Pre-Installation Considerations; Uncrate And Inspect The Unit Ventilator(S) - Daikin ARQ Installation And Maintenance Manual

Classroom unit ventilators standard series/geothermal series microtech (“j” vintage)
Hide thumbs Also See for ARQ:
Table of Contents

Advertisement

WARNING
"Polyolester Oil, commonly known as POE oil, is synthetic oil
used in many refrigeration systems. POE oil, if ever in contact
with PVC/CPVC, will coat the inside wall of PVC/CPVC pipe
causing environmental stress fractures. Although there is no
PVC/CPVC piping in this product, please keep this in mind when
selecting piping materials for your application, as system failure
and property damage could result."

Pre-Installation Considerations

Before beginning installation, please read this publication
in its entirety.
Directions given in this bulletin for right and left sides
assume a position facing the indoor side of the unit
ventilator.
Before beginning installation, if provided, remove the
protective plastic film covering the unit painted panels.
WARNING
Plastic packaging is a suffocation hazard, dispose of properly.
Keep away from children.
To be sure the correct unit ventilator(s) is/are installed in the
correct location(s), the installer must check the packing list
and unit identification/tagging number(s) against the plans.
Further, the unit data plate, (see Figure 1 on page 5)
located on the lower right end of the unit ventilator, contains
specific information of standard components as listed in the
"Nomenclature" on page 4.
Unit comes with an allen wrench and four (4) lagging washers in
the envelope placed in the end compartment of the unit (Figure 4).
Install this product in accordance with good engineering
practices and workmanship, following these general instructions,
plus the job-specific Daikin submittal drawings provided for
specific dimensions, unit arrangements, controls and electrical
details, pipe stub-up locations, etc. Applicable tools for lifting,
hook-up of piping, electrical and insulation are required.
www.DaikinApplied.com
Uncrate and Inspect the Unit
Ventilator(s)
Carefully remove the packaging, remaining alert to any signs
of shipping damage. Be careful not to discard components that
may be included with the packaging. (You may want to retain
some or all of the packaging to provide jobsite unit location
information and temporary protection for the unit ventilator
after installation.) Be sure to dispose of plastic packaging
and protective cardboard properly, in accordance with local
recycling rules and guidelines.
If unit is damaged, file a claim with the carrier. Notify the local
Daikin Unit Ventilator representative immediately.
Prior to unit installation, be sure that the exterior wall openings
and louvers, as applicable, are ready and in accordance with
the job plans.
Figure 4: Shipping envelope contents - located in right end
compartment of unit
7
IM 1083-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Grq

Table of Contents