7.4 Commissioning Test

The commissioning test for systems with safety functions is focused on validating the functionality of safety monitoring and stop
functions configured in the drive system.
The test objective is to verify proper configuration of the defined safety functions and of test mechanisms and to examine the response
of specific monitoring functions to the explicit input of values outside tolerance limits. Test safety-configured monitoring functions
running in the final set-up.
74 | Danfoss A/S © 2018.09
Description
Press [Cancel] to abort the customization of the safety option. A reset is required to finalize this
procedure.
B
1
FC 302 1
2
FC 302 2
M CT 10
LCP
RS485
PROFIBUS
1
FC 302 1
Service and Repair
C
2
3
FC 302 2
FC302 3
AQ279747441421en-000101 / 130R0292

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vlt safety option mcb 151

Table of Contents