Load Cells - Rice Lake 520 Installation Manual

Digital weight indicator
Table of Contents

Advertisement

2.3.1

Load Cells

To attach cable from a load cell or junction box, route
the cable to the external J6 connector.
Wire the load cell cable from the load cell or junction
box to connector J6 as shown in Table 2-1. If using
6-wire load cell cable (with sense wires), remove
jumpers JP1 and JP2 before reinstalling connector J6.
For 4-wire installation, leave jumpers JP1 and JP2 on.
When connections are complete, reinstall connector
J6 on the board.
GND1
F2
6
8
9
10
7
T1
11
15
14
13
12
RICE LAKE WEIGHING SYSTEMS
F1
J4
Figure 2-1. 520 CPU and Power Supply Board, Version 2.1
Connector
J6
For 6-wire load cell connections, remove
jumpers JP1 and JP2.
Table 2-1. J6 Pin Assignments
J1
J2
U19
U19
U19
U19
50
26
51
25
U22
75
1
76
100
ISP
GND2
J8
J5
J6
Pin
Function
1
+SIG
2
–SIG
3
+SENSE
4
–SENSE
5
+EXC
6
-EXC
7
SHIELD
ANALOG
TEST
GND1
+5V
TEST
–5V
TEST
+3.3V
JP2
JP1
J7
SETUP
Installation
7

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 520 and is the answer not in the manual?

Table of Contents

Save PDF