Insulation

Unit Insulation Requirements

Factory-installed insulation is available as an option for all
units. Factory installation does not include insulation of
the chiller feet; if required, insulation for chiller feet is
provided by others. In applications w here the chiller is not
factory-insulated, install insulation over the areas outlined
and highlighted w ith dashed lines as show n in
p.
40.
Insulate all 6.35-m m (1/4-in.) eductor lines, one from the
suction cover and one from the evaporator to prevent
sw eating.
The quantities of insulation required based on unit size
and insulation thickness are listed in
thickness is determ ined at norm al design conditions w hich
are:
standard com fort-cooling leaving chilled water
tem perature
29.4° C (85° F) dry bulb am bient tem perature
75 percent relative hum idity
Operation outside of norm al design conditions as defined
above m ay require additional insulation; contact Trane for
further review.
N ot e: If the unit is not factory-insulated: install insulation
around the evaporator bulbw ells and ensure that
the bulbw ells and connections for the waterbox
drains and vents are still accessible after insulation
is applied. The sensor m odules (LLIDs) and
interconnecting four w ire cable (IPC bus) m ust be
raised up above the field-installed insulation.
Secure the IPC bus to the insulation top/outer
surface after insulation is com pleted.
Im port ant : Do not insulate the m otor housing, unit
w iring, or sensor m odules.
Table 10. CVHH evaporator insulation requirements
1 9 0 .5 m m ( 3 / 4 in .) I n su la t ion
EVSZ
( St a n da r d Un it )
100M
100L
130M
160M
200M
200L
220M
220L
Notes:
1 . Unit s are NOT insulat ed on t he m ot or or refrigerant drain lines.
2 . 19.05- m m ( 3/ 4- in.) sheet insulat ion is inst alled on t he evaporat or,
evaporat or wat erboxes, suct ion elbow, suct ion cover, econom izer,
liquid lines, and piping.
3 . Copper oil educt or lines require pipe insulat ion.
CVHH-SVX001A-EN
Figure 25,
Table
10. Insulation
2
2
m
ft
61.4
661
63.2
680
63.5
684
66.1
711
68.6
738
71.1
765
71.5
770
74.2
799
Insulation Thickness
Requirements
Factory applied insulation.
surfaces are covered w ith 19.05 m m (3/4 in.) Arm aflex
or equal (therm al conductivity = 0.036 W/m
2
[0.25 Btu/h-ft
]), including the evaporator, waterboxes,
suction elbow, econom izer, and piping.
The insulation is Arm aflex or equivalent closed cell
elastom eric insulation to prevent the form ation of
condensation in environm ents w ith a relative hum idity up
to 75%. Chillers in high hum idity areas or ice storage, low
leaving water tem perature (less than 2.2° C [36° F] chilled
water tem perature/glycol) units m ay require double
thickness to prevent form ation of condensation.
NOTICE:
Insulation Damage!
To prevent damage to factory installed insulation:
Do not allow the insulation to be exposed to
excessive sunlight. Store indoors or cover w ith
canvas to prevent exposure.
Do not use thinners and solvents or other types of
paint. Use only water base latex.
Failure to follow these instructions could result in
insulation damage.
All low-tem perature
®
II
2
-K
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents