Trane CVHH Installation, Operation And Maintenance Manual page 104

Water-cooled centravac chillers with tracer adaptiview control
Hide thumbs Also See for CVHH:
Table of Contents

Advertisement

6 . Test ing
Dry nitrogen available for pressure testing (for
disassem bled units)
7.
Ref rigerant on job sit e and in close proxim it y t o chiller
Total am ount in cylinders: _______ (specify lb or kg)
8 .
Syst em s can be operat ed under load condit ions
9 .
Elect rical, cont rol m an, and cont ract or's represent at ive are available t o evacuat e, charge, and t est t he
CenTraVac under servicem an's supervision
10 . Equipm ent room
Does the equipm ent room have a refrigerant m onitor/
sensor capable of m onitoring and alarm ing w ithin the
allowable exposure level of the refrigerant?
Does the installation have properly placed and
operating audible and visual refrigerant alarm s?
11. Ow ner aw areness
Has the ow ner been fully instructed on the proper use
and handling of refrigerant?
N ot e: Additional tim e required to properly com plete the start-up and com m issioning, due to any incom pleteness of the
installation, w ill be invoiced at prevailing rates.
This is to certify that the Trane
above have been satisfactorily com pleted.
Checklist com pleted by (print nam e): _____________________________________________________________________________
Signature: _____________________________________________
In accordance w ith your quotation and our purchase order num ber __________________ , w e w ill therefore require the
presence of Trane service on this site, for the purpose of start-up and com m issioning, by __________________ (date).
N ot e: M inim um tw o-w eek advance notification is required to allow scheduling of the chiller start-up.
Addit ional com m ent s/inst ruct ions:
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
This docum ent and the inform ation in it are the property of Trane, and m ay not be used or reproduced in w hole or in part w ithout w ritten perm ission. Trane reserves
the right to revise this publication at any tim e, and to m ake changes to its content w ithout obligation to notify any person of such revision or change.
All tradem arks referenced in this docum ent are the tradem arks of their respective ow ners.
Trane optim izes the perform ance of hom es and buildings around the w orld. A business of Ingersoll Rand, the leader in
creating and sustaining safe, com fortable and energy efficient environm ents, Trane offers a broad portfolio of advanced
controls and HVAC system s, com prehensive building services, and parts. For m ore inform ation, visit w w w.Trane.com .
Trane has a policy of continuous product and product data im provem ent and reserves the right to change design and specifications w ithout notice.
© 2014 Trane All rights reserved
CTV-ADF001D-EN 10 Oct 2014
Supersedes CTV-ADF001-EN (04 Oct 2013)
®
equipm ent has been properly and com pletely installed, and that the applicable item s listed
We are com m itted to using environm entally
conscious print practices that reduce waste.
M aterial and equipm ent available for leak testing, if
necessary
Num ber of cylinders: _____
Size of cylinders: _____ (specify lb or kg)
Does the equipm ent room have proper m echanical
ventilation?
If it is required by local code, is a self-contained
breathing apparatus available?
Does the ow ner have a copy of the M SDS for
refrigerant?
Date: ______________________________

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents