Pitco Solstice and Solstice Supreme High Efficiency Gas Fryers
Gas Conversion
1. Remove the pilot assembly. See "Replacing an
Igniter/Pilot Assembly" on page 28.
2. Remove the nut, which holds the pilot tube,
using a 1/2 inch open-ended wrench.
3. Replace bullet orifice with one provide in the
gas conversion kit.
4. Change the main burner orifice tips.
5. Change the SCB orifice tip.
SG/SSH Series Service Manual
6. Replace and adjust the gas valve regulator.
7. Adjust the burner manifold pressure.
Manifold Gas Pressure Table
NAT
4.0"
a. Insert a flathead screwdriver into the cap
and turn counter-clockwise to remove it.
b. Insert flathead screwdriver into the cap and
turn counter-clockwise to increase the gas
pressure or clockwise to decrease the gas
pressure.
8. Put a sticker on the door saying the unit has been
converted.
49
LP
10"
Need help?
Do you have a question about the SG Series and is the answer not in the manual?