Power Demands And Counters; Acquisition Of Power Demand - Siemens SENTRON PAC3200T Product Manual

Measuring devices 7km
Hide thumbs Also See for SENTRON PAC3200T:
Table of Contents

Advertisement

Description

3.3 Power demands and counters

3.3
Power demands and counters
3.3.1

Acquisition of power demand

Values that can be read out
PAC3200T supplies the power demand of the last completed measuring period:
● Mean values for active power and reactive power, separated in each case for import and
export
● Minimum and maximum active power and reactive power
● Length of the demand period in seconds. The period may be shorter for reasons of
external synchronization.
● Time in seconds since the last synchronization or since completion of the last period.
Example: Period length and length of the demand period
Period length: 15 minutes; time of day: 13:03; time in seconds: 180 s.
The following can be calculated from this: The last demand period ended at 13:00. The
active demand period will end at 13:15 or in 12 minutes.
Availability
Note
The power demand of the last measuring period can only be fetched during the current
measuring period.
Adjustable parameters
● Time interval in minutes: 1 to 60 min adjustable, default 15 min
16
PAC3200T
Manual, 04/2017, L1V30415168B-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents