Manufacturer Menu - Daikin EWWQ-AJYNN Service Manual

Water-cooled screw chillers
Table of Contents

Advertisement

ESIE07-05
1.5.5

Manufacturer Menu

Introduction
In this menu you can set all manufacturer data. Password is required before the operation. The
parameters can be modified only by trained persons.
Warning: Improper Setpoint or value, can cause erratic chiller operation and damage to the
chiller. Please use caution whenever changing set points or value.
Overview
Unit Configuration
Probe enable (Master Board)
Probe enable (Slave Board)
Discharge probe type (B4)
Fase monitor type
Part 2 – Functional Description
Pid parameter
Integrative time
Derivative Time
00 = Air cooled Chiller
01 = Water/Water Heat Pump
02 = Water/Water Pursuit Chiller
03 = Water cooled Chiller
Unit config.
WATER COOLED
CHILLER
B1, B2, B4, B6, B7, B8
Probes enable
B1:
S
B2:
B4:
S
B5:
B7:
S
B8:
B4, B6, B7, B8
PT1000/NTC
Discharge Temp.
Probe Type
UNIT
Phase Monitor Type
UNIT
200sec
060sec
Temp. Regulation
Interval Time
Derivative Time
The Digital Controller
03
U:
X
S
B3:
-
S
B6:
N
S
PT1000
200
s
060
s
2–33
1
2
3
4
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents