Functional Control
1
Unit shutdown
2
3
Compressors start
up and loading
management
4
(4 compressors)
5
2–50
Unit S hutdown request
(see compressors shutdown in startup
and management procedure)
Flow switch opening within 180 s
Evaporator pump shutdown
Step n.
Leader Comp.
0
Off
1
If (T – SetP) < Start up DT & Cooling
or (SetP – T) < Start up DT & Heating
Waiting
2
Start
3
Load up to 75%
4
If T in Regulation Band Wait interstage time
5
If T is approaching SetP – Waiting
6a (T in unload
Unload up to 50%
band)
6b (T not in unload
Fixed at 75%
band)
6
Fixed at 75% or
50%
7 (If leader at 50%)
Load up to 75%
8
Fixed at 75%
9
If T in Regulation Band Wait interstage time
10
If T is approaching SetP – Waiting
10a (T inun load
Fixed at 75%
band
10b (T not in
Fixed at 75%
unload band)
11
Fixed at 75%
12 (If lag 1 at 50%)
Fixed at 75%
13
Fixed at 75%
14
If T in Regulation Band Wait interstage time
15
If T is approaching SetP – Waiting
Compressors shutdown
(user set)
Lag 1 Comp.
Off
Off
Off
Start
Start
Load up to 50%
Fixed at 50%
Load up to 75%
Unload up to 50%
Fixed at 75%
Fixed at 75% or
50%
Load up to 75%
Fixed at 75%
ESIE07-05
UNIT ALARM 005
(Evap Flow Alarm)
Lag 2 Comp.
Lag 3 Comp.
Off
Off
Off
Off
Off
Off
Off
Off
Off
Off
Off
Off
Off
Off
Off
Off
Start
Off
Start
Off
Load up to 50%
Off
Fixed at 50%
Off
Load up to 75%
Off