4.5 Installation Clearance Data
(1) When moving the outdoor unit, it is necessary to adopt 2 pieces of long enough rope to hand the
unit from 4 directions. Included angle between the rope when hanging and moving must be 40° below to
prevent center of the unit from moving.
(2) The outdoor unit should be installed on concrete base that is 10cm height.
(3) Requirements on installation space dimension of unit's bodies are shown in following drawing.
(4) The outdoor unit must be lifted by using designated lifting hole. Take care to protect the unit
during lift. To avoid rusting, do not knock the metal parts.
4.6 Outline Dimension of Indoor Unit
Description:
Installation
87
Unit: inch