Installation Clearance Data; Drain Piping Work - Gree GUHN24NK3HO Service Manual

U-match
Hide thumbs Also See for GUHN24NK3HO:
Table of Contents

Advertisement

U-Match Series Service Manual

1.1.5 Installation Clearance Data

Warning: The height of installation for the indoor unit should be 2.5m above.

1.1.6 Drain Piping Work

Installation of Drainage Pipeline:
Install the drain hose in accordance with the instructions in this installation manual and keep the
area warm enough to prevent condensation. Problems with the piping may lead to water leaks.
(1) Install the drain hose with downward gradient (1/50 to 1/100) and no risers or traps are used for
the hose. (Figure 3-1-8)
(2) Be sure there is no crack or leak on the drain hose to avoid the formation of air pocket. (Figure
3-1-8)
(3) When the hose is long, install supporters. (Figure 3-1-9)
(4) Always use the drain hose which has been insulated properly.
Figure 3-1-8
CAUTION!
Figure 3-1-9
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents