Seagull Models CESSNA 188 AGWAGON Assembly Manual page 29

Table of Contents

Advertisement

2) Position the elevator control horn on
the both side of elevator.
Elevator control horn.
3) Thread one clevis and M2 lock nut on
to each elevator control rod. Thread the
horns on until they are flush with the
ends of the control rods.
4) Elevator and rudder pushrods assem-
bly as pictures below.
725mm
M2 lock nut.
M2 clevis.
RUDDER PUSHROD
ISTALLATION.
Repeat steps as same as steps done for
elevator.
745mm
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sea 299

Table of Contents