Target Group / Qualifications Of Personnel - ABB i-bus KNX Product Manual

Room temperature controller
Hide thumbs Also See for i-bus KNX:
Table of Contents

Advertisement

2.4

Target group / Qualifications of personnel

Installation, commissioning and maintenance of the device must only be carried out by trained
and properly qualified electrical installers.
The electrical installer must have read and understood the manual and follow the instructions
provided.
The electrical installer must adhere to the valid national regulations in his/her country governing
the installation, functional test, repair and maintenance of electrical products.
The electrical installer must be familiar with and correctly apply the "five safety rules" (DIN VDE
0105, EN 50110):
1. Disconnect
2. Secure against being re-connected
3. Ensure there is no voltage
4. Connect to earth and short-circuit
5. Cover or barricade adjacent live parts
No special qualifications are needed to operate the device.
Product manual 2CKA001473B9482
Safety
│12

Advertisement

Table of Contents
loading

Table of Contents