Chapter 1 Planning; Installation And Commissioning Overview; Installation Checklist - Emerson Micro Motion Installation Manual

Specific gravity meters / gas specific gravity measurement
Hide thumbs Also See for Micro Motion:
Table of Contents

Advertisement

1
Planning
Topics covered in this chapter:
1.1

Installation and commissioning overview

Following is an overview of the tasks to install and commission the Specific Gravity Meter
(SGM). These tasks must be completed before configuring and using the meter.
As part of the SGM commissioning process, you are required to perform an onsite
calibration of the meter. Onsite meter calibration requires calibration gases and additional
hardware to calibrate the meter. See the configuration and use manual for more
information on planning the SGM commissioning. The configuration and use manual
provides guidance on selecting the calibration gases, as well as instruction on performing
an onsite calibration.
Process
Confirm you have all parts necessary and meet the basic installa-
tion requirements.
Consider the installation best practices for the meter.
Mount the meter.
Connect the gas bypass lines to the meter.
Wire the meter according to the recommended practices for
your process environment and required approvals.
Select the control pressure for the meter.
Purge cycle the meter.
Calibrate the meter.
1.2

Installation checklist

Installation Manual
Installation and commissioning overview
Installation checklist
Best practices
Recommended installation for specific gravity applications
Power requirements
Verify the contents of the product shipment to confirm that you have all parts and
information necessary for the installation.
Planning
Reference
See
Section 1.2
See
Section 1.3
See
Section 2.1
See
Section 2.2
See
Chapter 3
See Micro Motion Specific Gravi‐
ty Meters (SGM): Configuration
and Use Manual
1