Power Measurements Display - MGE UPS Systems Galaxy 3000 Installation And User Manual

10-30kva uninterruptible power systems
Table of Contents

Advertisement

3.2.5

Power Measurements Display

From the Power Measurements display, we can see the power being required by the load on each phase displayed
in kVA and in kW. Additionally, the source AC "normal" (AC N) is shown with the current kVA.
Pressing the key associated with the multiple documents icon, results in the Current Measurements display.
See Figure 3-7.
Figure 3-7: Power Measurements.
Power Measurements
Load Load
kVA
kW
Ph1
0.6
0.5
Ph2
0.6
0.5
Ph3
0.6
0.5
3.2.6
Current Measurements Display
From the Current Measurements display we can see the current being required by the two AC inputs (AC N and
AC BP) as well as the current being required on each of the three phases of the load. See Figure 3-8.
Pressing Soft Key #1 results in the Voltage Measurements display. See Figure 3-9.
Figure 3-8: Current Measurements.
Current Measurements
Load AC N
I1
5 A
5 A
I2
5 A
6 A
I3
5 A
5 A
IN
7 A
86-172010-00 C05
AC N
kVA
1.1
1.1
1.0
AC BP
0
A
0
A
0
A
0
A
Operation
Installation and User Manual
3 —7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents