Configuration Procedure; Fc Tracert Configuration Examples; Network Requirements - HP FlexFabric 5700 Series Configuration Manual

Fcoe configuration
Hide thumbs Also See for FlexFabric 5700 Series:
Table of Contents

Advertisement

1.
Uplink process
a.
Switch A adds its uplink path information (including its WWN and domain ID) to the STR
request packet and sends the packet to the next hop, Switch B.
b.
After receiving the packet, Switch B replies with an STR ACC packet to Switch A.
c.
Switch B adds its uplink path information to the received STR packet and sends it to the
destination switch, Switch C.
d.
After receiving the packet, Switch C replies with an STR ACC packet to Switch B.
e.
Switch C adds its uplink path information to the received packet. The collection of uplink path
information is complete.
2.
Downlink process
a.
Switch C sends the STR request packet to Switch A hop by hop in the same way as in the uplink
process.
b.
After receiving the STR request packet with a downlink flag, Switch A outputs information
about all uplink and downlink switches.

Configuration procedure

Task
Detect bidirectional routing
information between source
and destination.

FC tracert configuration examples

Network requirements

As shown in
identify the faulty node (if any).
Figure 34 Network diagram
Configuration procedure
1.
Configure Switch A:
# Configure the switch to operate in advanced mode. (Skip this step if the switch is operating in
advanced mode.)
<SwitchA> system-view
Command
fctracert [ -t timeout ] fcid fcid vsan vsan-id
Figure
34, detect bidirectional routing information between Switch A and Switch C, and
123
Remarks
Available in any view.
To abort the FC tracert
operation during the
execution of this command,
press Ctrl+C.

Advertisement

Table of Contents
loading

Table of Contents