Jumper Terminals 12 And; Asynchronous Motor Setup; Pm Motor Setup In Vvc Plus - Danfoss FC 300 Operating Instructions Manual

Vlt automationdrive 0.25-75 kw
Hide thumbs Also See for FC 300:
Table of Contents

Advertisement

Start Up and Functional Tes...
4.
Press the navigation keys to scroll to
0-03 Regional Settings and press [OK].
0.0%
Basic Settings
0-03 Regional Settings
[0] International
Illustration 3.3 0-03 Regional Settings
5.
Press the navigation keys to select International
or North America as appropriate and press [OK].
(This changes the default settings for a number
of basic parameters. See for a complete list.)
6.
Press [Quick Menu] on the LCP.
7.
Press the navigation keys to scroll to parameter
group Q2 Quick Setup and press [OK].
13.7%
Quick Menus
Q1 My Personal Menu
Q2 Quick Setup
Q5 Changes Made
Q6 Loggings
Illustration 3.4 Q2 Quick Setup
8.
Select language and press [OK].
0.0 Hz
Motor Setup
1 - 21 Motor Power [kW]
4.0
kW
Illustration 3.5 Select Language
9.
A jumper wire should be in place between
control terminals 12 and 27. If this is the case,
leave 5-12 Terminal 27 Digital Input at factory
default. Otherwise select No Operation. For
frequency converters with an optional bypass, no
jumper wire is required.
10.
3-02 Minimum Reference
11.
3-03 Maximum Reference
12.
3-41 Ramp 1 Ramp Up Time
13.
3-42 Ramp 1 Ramp Down Time
VLT
®
AutomationDrive Operating
Instructions
0.00A
1(1)
0-0
*
13.0A
1(1)
0.00kW
1(1)
Q2
®
MG33AM02 - VLT
is a registered Danfoss trademark
14.
3-13 Reference Site. Linked to Hand/Auto* Local
Remote.

3.4 Asynchronous Motor Setup

Enter the motor data in parameters 1-20/1-21 to 1-25. The
information can be found on the motor nameplate.
1.
1-20 Motor Power [kW] or 1-21 Motor
Power [HP]
1-22 Motor Voltage
1-23 Motor Frequency
1-24 Motor Current
1-25 Motor Nominal Speed
0.0 Hz
Motor Setup
1 - 21 Motor Power [kW]
4.0
kW
Illustration 3.6 Motor Setup
3.5 PM Motor Setup in VVC
CAUTION
Do only use PM motor with fans and pumps.
Initial Programming Steps
1.
Activate PM motor operation 1-10 Motor
Construction, select [1) PM, non salient SPM
2.
Make sure to set 0-02 Motor Speed Unit to [0] RPM
Programming motor data.
After selecting PM motor in 1-10 Motor Construction, the
PM motor-related parameters in parameter groups 1-2*,
1-3* and 1-4* are active.
The information can be found on the motor nameplate
and in the motor data sheet.
Following parameters must be programmed in the listed
order
1.
1-24 Motor Current
2.
1-26 Motor Cont. Rated Torque
3.
1-25 Motor Nominal Speed
4.
1-39 Motor Poles
5.
1-30 Stator Resistance (Rs)
Enter line to common stator winding resistance
(Rs). If only line-line data are available, divide the
line-line value with 2 to achieve the line to
common (starpoint) value.
0.00kW
1(1)
Q2
plus
27
3
3

Advertisement

Table of Contents
loading

Table of Contents