Table 16. Installation tasks (continued)
Task
Number
Task
2
Install any required optional modules into the switch.
3
Install the device on a desktop or in an equipment rack. "Installing the device" on page 17
4
Once the device is physically installed, plug the device
into a nearby power source that adheres to the
regulatory requirements outlined in this manual.
5
Attach a terminal or PC to the y-series device. This will
enable you to configure the device through the
Command Line Interface (CLI).
6
No default password is assigned to the CLI. For
additional access security, assign a password.
7
Before attaching equipment to the device, you need to
configure an interface IP address to the subnet on
which it will be located. Initial IP address configuration
is performed using the CLI with a direct serial
connection. Subsequent IP address configuration can be
performed using the Web management interface.
8
Once you power on the device and assign IP addresses,
the system is ready to accept network equipment.
9
Test IP connectivity to other devices by pinging them
and tracing routes.
10
Continue configuring the device using the CLI or the
Web management interface. You also can use IronView
Network Manager to manage the device.
11
Secure access to the device.

Preparing the installation site

Cabling infrastructure

Ensure that the proper cabling is installed at the site. Refer to "Cable
specifications" on page 53 for a summary of supported cabling types and their
specifications.

Installation location

Before installing the device, plan its location and orientation relative to other
devices and equipment. Switches can be mounted in a standard 19-inch equipment
rack that meets EIA-310D standards, or on a flat surface. Be sure to follow the
guidelines below when choosing a location.
The site should meet the following requirements:
v Maintain temperatures within 0 to 40⁰ C (32 to 104⁰ F) and humidity levels
v Allow a minimum of 7.6 cm (3 in.) of space between the sides and the back of
16
Ethernet y-series Installation and User Guide: Installation and User Guide
within 5% to 95%, non-condensing.
the device and walls or other obstructions for proper air flow.
Where to Find More Information
v "Installing an optional module on the
4002-Y2B and 4002-Y4B" on page 26
v "Installing an optional module on the
4002-Y2A, Y4A, Y2C, and Y4C" on page 27
"Powering on the system" on page 22
"Attaching a PC or terminal" on page 22
"Assigning permanent passwords" on page
29
"Configuring IP addresses" on page 30
"Connecting network devices" on page 34
"Testing connectivity" on page 38
FastIron Configuration Guide
FastIron Configuration Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

4002-y4a4002-y2b4002-y4c4002-y4b4002-y2c

Table of Contents