Panasonic S-22KA1E5S Service Manual page 121

Ka1e5 series, ya1e5 series, ua1e5 series, na1e5 series, ma1e5 series,
Hide thumbs Also See for S-22KA1E5S:
Table of Contents

Advertisement

POSITIONS OF AIR CONDITIONER BODY AND CEILING SURFACE
Tighten the nut and bolt to prevent unit from falling
Warning
HANGING POSITION OF THE AIR CONDITIONER BODY
11.7.4 REFRIGERANT PIPING
Refrigerant is charged to the outdoor unit. For details, see the manual for installation work of outdoor unit. (Additional
charging, etc.)
1.
Brazing for piping.
a. Execute brazing before tightening the flare nut.
b. Brazing must be executed while blowing
nitrogen gas. (This prevents generation of
oxidized scale in copper pipe.)
2.
When there is a lot of brazings for long piping,
install a strainer midway of the piping. (The
strainer is locally supplied.)
3.
Use clean copper pipe with inner wall surface
free from mist and dust. Blow nitrogen gas or air
to blow off dust in the pipe before connection.
4.
Form the piping according to its routing. Avoid
bending and bending back the same piping point
more than three times. (This will result in
hardening of the pipe).
5.
After deforming the pipe, align centers of the
union fitting of the indoor unit and the piping, and
tighten them firmly with wrenches.
6.
Connect pipe to the service valve in the outdoor
unit.
Vacuum drying
After completing the piping connection, execute vacuum drying for the connecting piping and the indoor unit.
The vacuum drying must be carried out by using the service ports of both the liquid and gas side valves.
CAUTION Use two wrenches and tighten with regular torque.
Flare nut fastening torque N•m (kgf•cm)
ø6.35mm
18 (180)
Hanging bolt
(W3/8 or M10)
Nut
(W3/8 or M10)
M10 Spring washer
Keep the length of the bolt
from the bracket to 40 mm
Ceiling
Adjust to the same height
ø12.7mm
Flat washer for M10 (accessory)
Flat washer for M10 (accessory)
Nut
(W3/8 or M10)
Air conditioner body
Set screw for
paper model
Paper model
(4 pieces)
for installation
Open the ceiling board along the
other edge of the paper model.
7.
After completed the piping connection, be sure to
check if there is gas leakage in indoor and
outdoor connection.
Confirm the round mark of the union (thin side) is
always at lower direction after connecting piping.
Liquid side piping
55 (560)
121
round mark
Gas side piping
ø6.35mm
ø12.7mm
Union

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents