Install The Power Interface Board; Hot-Swap Power Supply Cage Replacement - Lenovo ThinkSystem ST550 7X09 Maintenance Manual

Table of Contents

Advertisement

Install the power interface board

Use this information to install the power interface board.
"Read the
installation
Guidelines" on
page 59
Before installing the power interface board, touch the static-protective package that contains the new power
interface board to any unpainted surface on the outside of the server. Then, take the new power interface
board out of the package and place it on a static-protective surface.
To install the power interface board, complete the following steps:
Watch the procedure. A video of the installation process is available:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-Acsjj4tU79GzKnWG316BYn
• Youku:
http://list.youku.com/albumlist/show/id_50483452
Figure 115. Power interface board installation
Step 1.
Insert the hole in the power interface board into the corresponding mounting stud on the chassis.
Then, gently move the power interface board downward so that it is engaged with the mounting
stud.
Step 2.
Install the screw to secure the power interface board in place.
After installing the power interface board:
1. Reconnect all cables to the power interface board. See "Power interface board" on page 33.
2. Complete the parts replacement. See "Complete the parts replacement" on page 178.

Hot-swap power supply cage replacement

Use this information to remove and install the hot-swap power supply cage.
Note: This section applies only to server models that have the hot-swap power supply cage installed.
"Power off
the server
for this task"
on page 12
Chapter 3
"ATTENTION:
Static Sensitive Device
Ground package before opening"
on page 60
.
Hardware replacement procedures
157

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinksystem st550 7x10

Table of Contents