Install A Raid Super Capacitor Module; Air Baffle Replacement - Lenovo ThinkSystem ST550 7X09 Maintenance Manual

Table of Contents

Advertisement

If you are instructed to return the old RAID super capacitor module, follow all packaging instructions and use
any packaging materials that are provided.

Install a RAID super capacitor module

Use this information to install a RAID super capacitor module on the air baffle.
"Read the
installation
Guidelines" on
page 59
To install a RAID super capacitor module, complete the following steps:
Watch the procedure. A video of the installation process is available:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-Acsjj4tU79GzKnWG316BYn
• Youku:
http://list.youku.com/albumlist/show/id_50483452
Step 1.
Touch the static-protective package that contains the new RAID super capacitor module to any
unpainted surface on the outside of the server. Then, take the new RAID super capacitor module
out of the package and place it on a static-protective surface.
Step 2.
Insert one end of the RAID super capacitor module into the slot of the air baffle. Then, press down
the other end of the RAID super capacitor module until it snaps in place.
Figure 42. RAID super capacitor module installation
Step 3.
Connect the RAID super capacitor module to the extension cable.
After installing the RAID super capacitor module, complete the parts replacement. See "Complete the parts
replacement" on page 178.

Air baffle replacement

Use this information to remove and install the air baffle.
S033
"Power off
the server
for this task"
on page 12
Chapter 3
"ATTENTION:
Static Sensitive Device
Ground package before opening"
on page 60
.
Hardware replacement procedures
71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinksystem st550 7x10

Table of Contents