Post-Installation Check - Endress+Hauser Levelflex M FMP40 Brief Operating Instructions

Guided level-radar
Hide thumbs Also See for Levelflex M FMP40:
Table of Contents

Advertisement

Levelflex M FMP40 FOUNDATION Fieldbus
2.3.9 Turn housing
After mounting, the housing can be turned 350° in order to simplify access to the display and
the terminal compartment. Proceed as follows to turn the housing to the required position:
• Undo the fixing screws (1)
• Turn the housing (2) in the required direction
• Tighten up the fixing screws (1)
F12/F23 housing
2
1
2.4

Post-installation check

After the measuring device has been installed, perform the following checks:
• Is the measuring device damaged (visual check) ?
• Does the measuring device correspond to the measuring point specifications such as process
temperature/pressure, ambient temperature, measuring range, etc..?
• Are the measuring point number and labeling correct (visual check ?
• Is the measuring device adequately protected against rain and direct sunlight (see Chapter
"Accessories" in the Operating Instructions on the CD-ROM) ?
Endress+Hauser
T12 housing
2
1
allen key
4 mm/0.1"
Mounting
L00-FMP4xxxx-17-00-00-en-028
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Levelflex m fmp45

Table of Contents