Upgrading The Subsystem; Introduction; Table 4-1 Upgrade Options - Compaq PowerStorm 1000 Owner's Manual

Digital graphics subsystem
Table of Contents

Advertisement

4.1 Introduction

There are two upgrade options available for the PowerStorm 1000 graphics subsystems.
An entry PowerStorm 1000 graphics subsystem can be upgraded to a full PowerStorm
1000 and a full PowerStorm 1000 graphics subsystem can be upgraded to a high resolution
PowerStorm 1000.
Table 4-1 lists the upgrade options available for the PowerStorm 1000 graphics subsystems
along with a description.

Table 4-1 Upgrade Options

Option
SN-PBXGM-UA
SN-PBXGM-UB
An entry PowerStorm 1000 graphics subsystem can also be upgraded to a high resolution
PowerStorm 1000 by ordering and installing both of the options listed in Table 4-1.
________________________WARNING __________________________
Before servicing the PowerStorm 1000 graphics subsystem, ensure that the
power On/Off switch on the front of the deskside chassis is in the OFF
position and disconnect the deskside chassis power cord from the ac input
receptacle.
____________________________________________________________

Upgrading the Subsystem

Description
For upgrading an entry PowerStorm 1000 to a full PowerStorm 1000
For upgrading a full PowerStorm 1000 to a high resolution PowerStorm
1000
DIGITAL PowerStorm 1000 Graphics Subsystem Owner's Guide 4–1
4

Advertisement

Table of Contents
loading

Table of Contents