Mitsubishi Melsec-A AJ65SBT User Manual page 59

Cc-link - cc-link/lt bridge module
Table of Contents

Advertisement

4 PROCEDURE UP TO DATA LINK
1) Correctly place the dedicated flat cable
in the cover. (Check that the position
of the orange part is correct.)
Orange
Note 1) This setting position is wrong.
5) Cut 2 portions of the edge of the cover
with nippers and remove the edge.
Cut
4 - 10
(2) Operating procedure
The operating procedure is illustrated below.
(a) Terminal Processing
2) Close the cover so that the flat cable
will be held between both sides of the
cover.
Note 2) If the orange part is seen through
the guide hole in the front cover,
Orange
the wiring is not correct. Open
the cover and perform the
previous step again.
Orange
(b) T-Branch Processing
6) Set the cover at the point where
T-branch is to be set.
Orange
3) Assemble the cover with the body and
pressure-weld them using pliers or
similar device.
Orange
4) Check that all of four latches are
engaged. Pressure-welding is
completed.
7) Execute pressure-welding as
instructed in step 3 to 4.
Orange
MELSEC-A
Orange
Orange
4 - 10

Advertisement

Table of Contents
loading

Table of Contents