Run A Test Program - Rain Bird E-6C User Manual

Hide thumbs Also See for E-6C:
Table of Contents

Advertisement

Manually Run a Program
DIAGRAM 24
1. Turn the programming dial to MANUAL CYCLE.
2. Program A appears in the display.
3. To choose another program, press the PROGRAM button
(ABC) until the desired program letter appears in the
display.
4. Press ENTER to start the selected program.
NOTES: You can “stack” two or three programs to
operate manually by pressing ENTER after
selecting each program.
The controller runs stacked programs in order (A,
then B, then C), no matter in which order you stack
them. For example, if you start program B, then
stack program C, then program A, the controller
will finish B, and then run A, and finally C.
5. Turn the programming dial back to AUTO. The letter of the
manually operating program (A, B, or C) appears in the
display. Any “stacked” programs flash until their turn to
run.
20
NOTE: Water budgeting does apply to manually
operated programs.
After the last manual program runs, the controller returns to
AUTO mode and awaits the next scheduled program start time.
NOTES: Manually operating a station does not
affect the station’s run time(s) in the automatic
programs (A, B, or C).
Manual operation cancels the operation of any
automatic program in progress. Also, Water
Budgeting does not affect manually operated
stations.

Run a Test Program

DIAGRAM 25
The controller’s built-in test program will run each station that
has a non-zero watering time. When you run the test program,
the controller operates each station in numerical sequence,
from lowest to highest. You can use this feature to check the
operation of all sprinklers in the system.
1. To test all controller stations, turn the programming dial to
TEST.
Ec Controller

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents