Run Test Program

The controller’s built-in test program will run each station that
has a non-zero watering time assigned to it. When you run the
test program, the controller will operate each station in
numerical sequence, from lowest to highest. You can use this
program to check the operation of all the sprinklers in the
system.
Turn the dial to “TEST/ Station Delay.”
The display shows “TEST” and the amount of time each
station will run. The default test run time is two minutes per
station.
Press ñ or ò to increase or decrease the run times for
the TEST PROGRAM. The maximum test run time is 10
minutes.
Press “MAN. START/ADV.” to start the test program.
Turn the dial to “AUTO.”
The display shows the number of the station that is
running, along with its remaining run time. The controller
runs each station in sequence, from lowest number to
highest. The test program skips any stations that have
zero watering times assigned to them. When the test
program is finished, the controller returns to automatic
operation.
To cancel a test program after it has started, turn the dial
to “O..” for three seconds. Then turn the dial back to
“AUTO.”
36
ESP-LX+ & LXi+ Installation, Programming, & Operation Guide

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ESP-6LX+ and is the answer not in the manual?

Questions and answers

Table of Contents