Step 1: Installing The Fiber Modules; Step 2: Checking The Battery Status And Verifying Operation With Fiber Modules - Fluke DTX-1800 Technical Reference Handbook

Cableanalyzer
Hide thumbs Also See for DTX-1800:
Table of Contents

Advertisement

DTX Series CableAnalyzer
Technical Reference Handbook

Step 1: Installing the Fiber Modules

1-1 Turn off the tester and smart remote.
1-2 Remove the cover from the back of each unit and install
a DTX-MFM2, DTX-GFM2, or DTX-SFM2 module in each
unit, as shown in Figure 2-8.
Figure 2-8. Installing Fiber Modules
2-14
Leave the module bay covers in place when the
fiber modules are not installed.
Step 2: Checking the Battery Status and Verifying
Operation with Fiber Modules
2-1 Clean the tester's connectors and the connectors on two
SC/SC reference test cords. See page 7-9 for details on
cleaning.
2-2 Connect the tester and smart remote together, as
shown in Figure 2-9.
2-3 Turn the rotary switch to SPECIAL FUNCTIONS.
D
2-4 Use
H
. Press
D
2-5 Use
P
2-6 Press
amd34af.eps
W
Caution
to highlight Battery Status; then press
I
when you are done.
to highlight Self Test; then press
to start the self test.
H
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dtx-ltDtx-mfm2Dtx-1200Dtx-gfm2Dtx-sfm2

Table of Contents