Snap Expansion S50 Hardware Checklist
The following checklist shows the required and optional hardware to install an S50 , and
indicates whether a component comes with the server or must be supplied by the customer.
Component
Description
Z
Connection
SAS Cable (1 per enclosure)
and Power
Required to connect the expansion array to the host SnapServer.
Z
Power Cables (2 per enclosure)
Required to plug into the mains.
̌
APC-Brand UPS Device(s) (optional)
The S50 should be connected to the same UPS as the SnapServer to which it
is attached.
Z
Rack
Rack Mount Brackets
Two (2) rack mount shelves and screws for attaching the server to a rack.
̌
S50 expansion arrays are designed for use with EIA-compliant 4-post racks.
EIA-Compliant Rack
Chapter 1 SnapServer and Expansion Array Hardware Components
SnapServer Hardware Checklists
23