6.10.6 CT locations for the case of feeding transformer and backup generator
Many installations are fitted with backup generators to ensure the proper operation of
the installation in case of a mains supply outage.
A typical configuration is given in
Figure 46: Single line diagram of an installation with a backup generator
The CT connection must be such that the active filter works whatever the type of supply:
generator or transformer-MV network.
For each phase, one CT is installed in the transformer branch and one in the generator
branch. Those two CTs must be identical (X / 5 A) and must be connected to a
summation CT rated 5+5 / 5 A.
The CT ratio to be programmed in the filter is: 2×X/5.
connection diagram per phase.
P1, K
P2, L
Figure 47: CT connections for the case of a feeding transformer with backup generator
66 Electrical design and installation ç Manual Power Quality Filter PQFM
Figure
LOAD
G
S1, k
S2, l
S1, k
P1, K
S2, l
P2, L
(to be done for each phase)
46.
G
PQF
Figure 47
P1
S1
P2
P1
S2
P2
gives the corresponding
k
L
PQF