Commissioning Instructions; What This Chapter Contains - ABB PQFM Instruction Manual

Power quality filter
Table of Contents

Advertisement

8 Commissioning instructions

8.1

What this chapter contains

This chapter presents the steps to follow to commission the active filter. The
commissioning of your PQF should be conducted in strict accordance with this
procedure.
Before applying the commissioning procedure, make sure that you are familiar with:
-
The filter hardware (discussed in
-
The mechanical installation requirements (discussed in
-
The electrical installation requirements (discussed in
-
The PQF programming interface PQF-Manager (discussed in
-
If the Modbus option has been installed, please refer to the document
"2GCS212013A0050-RS-485 Installation and Start-up guide" for more information
on this item.
The commissioning procedure consists of 9 steps that should be strictly followed.
Steps
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Section 8.11
presents the commissioning report to be filled in when commissioning the
filter.
Table 56: Steps to follow to commission the active filter
Actions
Visual and installation check
Setting the address of each unit in a multi-unit filter and terminate the CAN
bus
Voltage rating and phase rotation check
Basic commissioning parameters setup
Automatic and manual CT detection procedure
Before starting the filter
Start the filter
Generate filter load
Set up the user requirements
Manual Power Quality Filter PQFM ç The PQF-Manager user interface 159
Chapter
4).
Chapter
5).
Chapter
6).
Chapter
7).

Advertisement

Table of Contents
loading

Table of Contents