Section 3 - Operation
3.10

Loading/Unloading

Know and heed all national, state/provincial and local
rules which apply to transporting of aerial platforms.
Only qualified/competent personnel shall operate the
aerial platform during loading/unloading.
Be sure vehicle capacity and loading equipment
hoists, chains, straps, etc., are sufficient to withstand
maximum aerial platform weight.
The transport vehicle must be parked on a level surface
and must be secured to prevent rolling while aerial
platform is being loaded or unloaded.

3.10-1 Loading and Tie-down

1.
Lock turret using turret transportation lock
(refer to
Section
3.10-2).
2.
Turn key switch to "
key before transporting.
SJ 46AJ
" off position and remove
Figure 3-6. Tie-down Points
December 2007
3.
Turn main power disconnect switch to "
position.
4.
Chock aerial platform wheels (if necessary).
5.
Remove all loose items.
6.
Anchor down aerial platform to transport surface
using tie-down points (refer to
7.
Secure boom from side-to-side movement using
lower platform mount between boom end and
platform. Do not use excessive downward force
when securing boom section.
Inspect aerial platform for loose or
unsecured items.
For loading and unloading using a winch
line, refer to
Loading/Unloading
Figure
3-6).
WARNING
NOTE
Section
2.5.
Page 57
" off