3/ Installation Procedure; 3.1. Packing Check List; Requirements Iec60950-1 - Kontron SMARC Eval-Carrier-2 User Manual

Table of Contents

Advertisement

SMARC Eval-Carrier-2 – . Rev. 1.1

3/ Installation procedure

3.1. Packing Check List

The package includes the following basic items accompany with this manual.
One board
If this item is damaged or missed, please contact your vendor and save all packing materials for future replacement
and maintenance.
Note: The above packing list is for standard single box packing only.

3.2. Requirements IEC60950-1

Take care when designing chassis interface connectors in order to fulfil the IEC60950-1 standard.
Users of board must evaluate the end product to ensure compliance the requirements of the IEC60950-1 safety
standard are met:
The motherboard must be installed in a suitable mechanical, electrical and fire enclosure.
The system in its enclosure must be evaluated for temperature and air flow considerations.
For interfaces having a power pin such as external power or fan, ensure that the connectors and wires are suitably
rated. All connections from or to the product shall be with Safety Extra Low Voltage (SELV) circuits only.
Wires have suitable rating to withstand the maximum available power.
The enclosure of the peripheral device fulfills the fire protecting requirements of IEC60950-1.
www.kontron.com
// 13

Advertisement

Table of Contents
loading

Table of Contents