Arjohuntleigh citadel Instructions For Use Manual page 13

Patient therapy system
Hide thumbs Also See for citadel:
Table of Contents

Advertisement

8. Lift air mattress control unit and slightly tilt the air mattress control
unit forward and then gently lower it onto the frame. Carefully align
holes on top of mounting bracket with holes on frame. As air mattress
control unit sits onto the frame, gently tilt to full upright position while
observing that the communication connector (see figure 3, item 7) on
control unit aligns to hole in frame. Be careful not to damage the air
connectors.
9. Gently slide air mattress control unit from side to side to align holes on
top and on front of mounting bracket with holes on extension frame.
10. Loosely install four Philips Pan Head screws through the top of
mounting bracket (figure 3, item 3) (Do not tighten at this time).
11. Install three hex socket screws through the holes on the front of
mounting bracket. These pass through the mounting bracket / frame
extension and screw into the mattress control unit. Torque screws to
10 Nm.
12. Now tighten the four Philips Pan head screws started earlier on top of
the mounting bracket. Torque screws to 10 Nm.
13. Install two pan-head Philips screws (figure 3, item 6), on the back of
the control unit, RH / LH lower corners.Torque screws to 10 Nm.
14. Connect air hoses (figure 4, item 1) to air mattress control unit (2);
ensure O-rings are on connection ports. Air hoses attach straight
across from the dump valve assembly over the foot extension
crossbar to the air mattress control unit in order from left to right / right
to left. A distinct click will be heard when the air connectors are fully
attached.
2
3
Figure 4: Connect air hoses to mattress control unit
15. Connect AC power cable (figure 4, item 3), CPR cable (4) and
communication cable (5).
Citadel Patient Therapy System
1
4
5
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Citadel c200Citadel c100

Table of Contents