GUI Software Installation

The TAS5508 GUI provides easy control of all registers in TAS5508B. The latest TAS5508 GUI can be
downloaded from the
To install the software, run the setup file of the GUI.
After installation, turn on power supplies and connect USB cable to Input-USB board.
Start the GUI program from Microsoft
For more advanced use of the GUI, see the GUI User's Guide and data manual for TAS5508B
(SLES162).
3
Protection
This section describes the short-circuit protection and fault-reporting circuitry of the TAS5342 device.
3.1
Short-Circuit Protection and Fault-Reporting Circuitry
The TAS5342 is a self-protecting device that provides fault reporting (including high-temperature
protection and short-circuit protection). The TAS5342 is configured in back-end auto-recovery mode and
therefore resets automatically after all errors (M1, M2, and M3 is set low); see the data sheet (SLAS557)
for further explanation. This mean that the device restart itself after an error occasion and reports shortly
thereafter through the SD error signal.
3.2
Fault Reporting
The OTW and SD outputs from TAS5342 indicate fault conditions. See the TAS5342 data manual for a
description of these pins.
8
TAS5342DDV6EVM
TAS5342DDV6EVM
product folder on www.ti.com.
Windows
®
Figure 3. TAS5508 GUI Window
Copyright © 2008–2015, Texas Instruments Incorporated
menu. Start up of the GUI takes a few seconds.
®
SLAU239A – February 2008 – Revised September 2015
www.ti.com
Submit Documentation Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PurePath Digital TAS5342DDV6EVM and is the answer not in the manual?

Table of Contents