www.ti.com
4.20 Pop/Click (BTL)
No input signal applied. The measurement results are presented in time domain.
Test with automute disabled – Register x04h set to x60h. No input signal applied. Load 4 Ω.
40m
35m
30m
25m
20m
15m
10m
5m
0
-5m
-10m
-15m
-20m
-25m
-30m
-35m
-40m
4.21 Pop/Click (PBTL)
No input signal applied. The measurement results are presented in time domain.
Test with automute disabled – Register x04h set to x60h. No input signal applied. Load 2 Ω.
40m
35m
30m
25m
20m
15m
10m
5m
0
-5m
-10m
-15m
-20m
-25m
-30m
-35m
-40m
SLAU239A – February 2008 – Revised September 2015
Submit Documentation Feedback
0
1m
1.5m
500m
t - Time - sec
Figure 23. Pop/Click (BTL)
0
500m
1m
1.5m
t - Time - sec
Figure 24. Pop/Click (PBTL)
Copyright © 2008–2015, Texas Instruments Incorporated
TAS5342DDV6EVM Performance
2m
2.5m
3m
3.5m
3.5m
2m
2.5m
3m
4m
4m
21
TAS5342DDV6EVM
Need help?
Do you have a question about the PurePath Digital TAS5342DDV6EVM and is the answer not in the manual?