Summary of Contents for Texas Instruments TAS5086-5186V6EVM
Page 1
TAS5086-5186V6EVM User’s Guide Evaluation Module for the TAS5086 6-Channel Digital Audio PWM Processor and Power Output Stage TAS5186A Digital Amplifier User's Guide JULY 2006 SLEU073...
Page 2
SLEU073 – JULY 2006 Submit Documentation Feedback...
Chapter 1 SLEU073 – JULY 2006 Overview The TAS5086-5186V6EVM PurePath Digital™ customer evaluation amplifier module demonstrates two audio integrated circuits, TAS5086 and TAS5186ADDV, from Texas Instruments (TI). The TAS5086DBT is a high-performance 32-bit (24-bit input) multichannel PurePath Digital pulse width modulator (PWM) based on Equibit™ technology, with a fully symmetrical AD modulation scheme.
This chapter describes the TAS5086-5186V6EVM board in regards to power supplies and system interfaces. Power Supply (PSU) Interface (J901) The TAS5086-5186V6EVM module must be powered from external power supplies. High-end audio performance requires a stabilized power supply, with low ripple voltage and low output impedance. Note: The length of power-supply cable must be minimized.
NET-NAME AT SCHEMATICS DESCRIPTION OUT-1 Speaker negative output OUT-2 Speaker positive output Control Interface (J40) This interface connects the TAS5086-5186V6EVM board to a TI input-USB board. Table 2-4. J40 Pin Description PIN NO. NET-NAME AT SCHEMATICS DESCRIPTION Ground RESERVED —...
Page 9
www.ti.com Control Interface (J40) Table 2-4. J40 Pin Description (continued) PIN NO. NET-NAME AT SCHEMATICS DESCRIPTION RESERVED — RESERVED — RESERVED — Ground RESERVED — RESERVED — Shutdown error reporting for all channels. Activated if TAS5186A has high current or high temperature. See Chapter 3, Protection.
www.ti.com Digital Audio Interface (J60) Digital Audio Interface (J60) The digital audio interface contains digital audio signal data (I S), clocks, etc. Please see the TAS5086 Data Manual for signal timing and details not explained in this document. Table 2-5. J60 Pin Description PIN NO.
Chapter 3 SLEU073 – JULY 2006 Protection This chapter describes the short-circuit protection and fault-reporting circuitry of the TAS5142 device. Short-Circuit Protection and Fault-Reporting Circuitry The TAS5142 is a self-protecting device that provides device fault reporting (including high-temperature protection and short-circuit protection). The TAS5186A is configured in back-end auto-recovery mode and, therefore, resets automatically after all errors.
• TAS5086-5186V6EVM Application Report (SLEA054) • PC Configuration Tool for TAS5086 (TAS5086 GUI ver. 4.0 or later) • General application notes Trademarks Equibit, PowerPAD, and PurePath Digital are trademarks of Texas Instruments. SLEU073 – JULY 2006 Related Documentation from Texas Instruments Submit Documentation Feedback...
Page 14
EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
TI as compliant with ISO/TS 16949 requirements. Buyers acknowledge and agree that, if they use any non-designated products in automotive applications, TI will not be responsible for any failure to meet such requirements. Following are URLs where you can obtain information on other Texas Instruments products and application solutions: Products...
Need help?
Do you have a question about the TAS5086-5186V6EVM and is the answer not in the manual?
Questions and answers